Browse recent commercial building permits in Austin, Texas. Find new construction, renovations, and tenant buildouts before your competitors.
Showing all trades · Live data from public permit records
Replacement of the sewer yard line.
Replacement of an existing water heater Replacement of an existing water heater Replace 40-gallon electric water heater Located in hallway closet UNT
Remodel for existing McDonalds.
7 DAY - FINISH OUT ADMIN OFFICE - OVA
Demolition of church structure and shed approximately 5500 sq ft (circa 1969)
Replacement of the existing fire pump and controllers.
ePlan: Commercial Expedited Review - [APPROVED] New Construction Transformer Pad
Replacement of complete existing central heat and air system with or without duct work unit 225
Replacement of an existing water heater Replacing like for like water heater
New Construction Office Whse spec - Building 6 - Concurrent Review: SP-2022-0136C
INTERIOR REMODEL
Remodel of existing office spaces for tenant who is expanding into adjacent suites. Access control requested.
Tenant Office Build Out for Suite 100 - No Change of Use No Access Control. No Hazmat as this as spec suite.
New construction of 4 Plex Concurrent Review Request with Site plan Review Buildings 1357 9 and 10 S.M.A.R.T. Housing
New construction of 4 Plex Concurrent Review Request with Site plan Review Buildings 1357 9 and 10 S.M.A.R.T. Housing
Landscape Irrigation
Interior finishes and fixtures replace storefront doors
INTERIOR ALTERATION OF APPROX. ( 10388 SF ) OF EXISTING INTERIOR SPACE.
Install 1 3/4 HP walkin cooler / Install 1 HP walkin freezer commercial property Builders Permit # 2026-007156 BP / Sub Type C-1000 Commercial Remode
Change of use from retail to personal improvement services. Minor interior remodel.
New construction of 4 Plex Concurrent Review Request with Site plan Review Buildings 1357 9 and 10 S.M.A.R.T. Housing
Automatic irrigation system/lawn sprinkler system ref 2026-025605 W
Installation of 1 dual port level 3 DCFC EV Chargers City of Austin Fleet Mobility Services Department Electrification Infrastructure Phase 5
Phase 2: Interior expansion of EYs existing suite project will include new meeting rooms breakroom demountable walls new finishes: carcarpet acoustica
Remodel for existing McDonalds.
New construction of 4 Plex Concurrent Review Request with Site plan Review Buildings 1357 9 and 10 S.M.A.R.T. Housing
Installation of 60 amp service on free standing rack for irrigation controller and lighting power to mail kiosk.
The proposed work consists of the replacement of AHU-1 and AHU-3 with associated penthouse and roof curb replacement of RTU-1A 1B 1C 1D and 2A and ins
Tenant process improvement including demising wall for production room exterior gas storage enclosure and gas piping for production.
INTERIOR REMODEL
Tenant Office Build Out for Suite 100 - No Change of Use No Access Control. No Hazmat as this as spec suite.
Replace 2 backflow preventers located in cabinets under the coffee machines
Tenant Finish-out and Interior Remodels.
Vehicle hit unit and gas line. MTZ to repair and test gas line. behind unit 121
QT - REMOVE AND REPLACE SIDING - OVA
Interior finish-out
6 lateral Fire Line from water into the building fire riser room ref : 2024-135584 BP
Modification to existing medical gas system to provide one (1) medical air outlet and one (1) waste anesthetic gas disposal (WAGD) inlet at the ceilin
ePlan: Commercial Expedited Review - [APPROVED] New Construction Prefab Hazmat Storage Shed.
CHANGE OF USE TO GENERAL RESTAURANT GENERAL RETAIL AND PERSONAL SERVICES WITH REMODEL.
Replacement of complete existing central heat and air system with or without duct work 6 ton rooftop unit replacement
15-25 Day INSTALL new (2) Make-up Air units and some exhaust duct work for customers existing equipment
7 DAY - Remodel of Existing Retail Space for New Tenant Barton Creek Square Mall - OVA
FOr UT - no BP required* Temporary Power (800A) service
FVF Law Firm Sign B
Interior remodel to existing office suite to construct 1 small office area. No plumbing scope. No access control scope. All access control is existing
*Secondary Contractor* Install commercial kitchen hood system with ductwork and rooftop exhaust fan install DOAS (make-up air) unit and complete refri
Change of Use personal services to Medical - 2880 SF new build-out of existing shell space construction to include: interior walls floors finishes int
Interior remodel to existing business admin office. Access Control requested.
Suite 300 side of new demising wall related to suite 350 expansion. No other scope in suite 300.
Replacement or addition to an existing unit of up to four supply or return duct runs Replacing 1 AHU - Add 1 AHU
ETJ- New Commercial for Tesla 1000 sq. ft. Run gas piping in high bay 56.1 thru 57.4 and non1 thru r.2
Replacement of complete existing central heat and air system with or without duct work
3 new pre-engineered metal buildings for vehicle storage with storage rooms. Building Q has restrooms an office space and storage rack for meter distr
QT - REMOVE AND REPLACE 17 WINDOWS LIKE FOR LIKE AT EXISTING MULTIFAMILY RESIDENTIAL NO STRUCTURAL CHANGES - OVA
Install one monument sign for WOODLAND PLACE
Interior Renovation of an Existing EMS Station this project includes deferred maintenance in order to bring the station closer to alignment with the c
Interior renovation to the basement level of an existing mercantile space to include accessible route from existing elevator to existing mercantile ar
ILLUMINATED CHANNEL LETTERS READING RECOVER + PERFORM
Remodel for existing McDonalds.
7 DAY - INTERIOR RENOVATION OF AN EXISTING TENANT LEASE SPACE. NO CHANGE TO OCCUPANCY OR USE. THE GENERAL SCOPE OF THE PROJECT INCLUDES ALTERATION TO
ePlan: Commercial Expedited Review - New Construction of Athletic Center to Include New Gym and Fieldhouse (20380 SF).
Change of Use personal services to Medical - 2880 SF new build-out of existing shell space construction to include: interior walls floors finishes int
FVF Law Firm Sign C
TEMPORARY BUILDING PERMIT scope of permit is limited to under slab utilities and foundation structural including piers and beams footings and concrete
Tenant Finish Out for Suite 701
ePlan: Commercial Expedited Review - [APPROVED] New Construction Prefab Guard Booth.
3 new pre-engineered metal buildings for vehicle storage with storage rooms. Building Q has restrooms an office space and storage rack for meter distr
ePlan: Commercial Expedited Review - [PUBLIC PROJECT] Interior Remodel to Austin High School. Phase 2. (396761 SF).
CHANGE OF USE TO GENERAL RESTAURANT GENERAL RETAIL AND PERSONAL SERVICES WITH REMODEL.
ILLUMINATED CHANNEL LETTERS READING BONE DRS ORTHOPEDIC CARE
ePlan: Commercial Expedited Review - [PUBLIC PROJECT] Interior Remodel to Austin High School. Roof Recovering at Theater Building. (396761 SF).
Tenant process improvement including demising wall for production room exterior gas storage enclosure and gas piping for production.
3 new pre-engineered metal buildings for vehicle storage with storage rooms. Building Q has restrooms an office space and storage rack for meter distr
FIRST-TIME INTERIOR FINISH-OUT OF +/- 1013 SF SHELL SPACE. SCOPE INCLUDES BEVERAGE SERVICE COUNTER WITH INTEGRATED STORAGE LIMITED RETAIL DISPLAY FOR
TEMPORARY BUILDING PERMIT scope of permit is limited to excavation work under the building footprint foundation interior walls and columns under grade
Addition of exterior concrete enclosure with roof to store flammable gases in the truck court.
ePlan: Commercial Expedited Review - [PUBLIC PROJECT] Interior Remodel of Art Classrooms in Main Academic Building and Associated Mechanical Repairs t
Cap off water & waste water
ePlan: Commercial Expedited Review - [PUBLIC PROJECT] Addition and Remodel to Austin High School. Phase 3. (396761 SF).
Change of use to create a restaurant in existing unit new grease trap installation and interior remodel
Temp Power Crane - Temporary Transformer 800 Amps Please reference permit 2026-014441 EP
ePlan: Expedited Review - New Construction of Convenience Store / Food Sales (6000 sf.)
7 DAY - Interior remodel of existing office space - OVA
First time finish out to create a gym for children 3-12 years. (Bldg. 1)
HB 2334 - Plumbing Service Line
ePlan: Commercial Expedited Review - Remodel of Apartment Complex- Scope of Work to Interior Remodel of 24 Units 3 Story Walkup Building. (16686 SF)
Interior remodel to business office suite. Minor MEP work with new demising and partition walls and finish work. No access control.
ePlan: Commercial Expedited Review - Interior Remodel of Floor 13 (36112 SF)
ePlan: Commercial Expedited Review - Interior Remodel of Floor 13 (36112 SF)
Wall sign for Shabuyaki East
ePlan: Commercial Expedited Review - Interior Remodel of Floor 1 (9020 SF).
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review - Interior Remodel of Floor 13 (36112 SF)
Replacement of complete existing central heat and air system with or without duct work
Replacement of an existing water heater Remove and replace Water Heater - 40 gal Electric Run water heater drain pan line to exterior of home and seal
Interior Remodel of Existing Office Space. Area C: -Demo Combining Suites Addition of New Partitions Ceilings Millwork Finishes and New Mechanical P
Installation of 2 EV Chargers CITY OF AUSTIN FLEET MOBILITY SERVICES DEPARTMENT ELECTRIFICATION INFRASTRUCTURE PHASE 5 C.I.P. PROJECT NUMBER: 6011.045
Remove and replace 5 windows and 1 sliding door like for like no structural changes. (Unit B)
Replacement of complete existing central heat and air system with or without duct work
See all permits with contractor contact info. We’ll send you new commercial permits in your area every week.
No spam. Unsubscribe anytime.
JobSteady scans permits, property records, and business data to connect you with commercial clients who need your trade right now.
Try the Free Client Finder →