re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Roofing
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Roofing
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Roofing
solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, with 15 kwh each in capacity, ess units will not be closer than 3 feet | install ess system only. (1) franklin apower 2 and
ElectricalRoofingFencing
solar permit: mounted: roof, ballasted: n, including 7 energy storage unit, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | installation of energy storage system only. system in
ElectricalRoofingFencing
solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | (1) tesla backup switch [1624171-xx-y
ElectricalRoofing
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Roofing
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Roofing
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Roofing
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Roofing
reroofing. no hot works.
Roofing
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Roofing
reroofing. no hot works.
Roofing
pier 1 storage at fort mason: reroofing no hot works
Roofing
reroofing: remove the (e) roof and install modified bitumen with 2 layers of base. no hot works.
Roofing
reroofing: remove the (e) shingles and install asphalt shingles with synthetic underlayment. no hot works.
RoofingPaving
reroofing torch down
Roofing
reroof w/torch down.
Roofing
solar permit: installing 17 solar pv modules, 440 watts per module, total no. of rating 7.48 kw. mounted: roof, ballasted: n, including 2 energy storage unit, with 13.5 kwh each in capacity, ess units
Roofing
1. modify the central cooling plant. 2. existing chillers will be demolished, and new chillers will be installed. 3. cooling tower vibration isolation springs on the roof will be replaced.
HVACElectricalRoofing
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Roofing
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Roofing
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Roofing
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Roofing
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Roofing
interior remodel. 9 windows replacement (some are street visible). roof repair. new furnace installation, electrical, and plumbing work associated with remodel. u-factor=0.27 max.
PlumbingHVACElectricalRoofing
Get Full Permit Data + Weekly Alerts
See all permits with contractor contact info. We’ll send you new commercial permits in your area every week.
No spam. Unsubscribe anytime.